A leak on the district heating system has been identified at the end of the Central Hall Bridge on the corner with Physics/Exhibition Centre. Excavation works have been planned for 29 December during which we will be able to identify the extent of the problem and assess what action will be required from that point. At this point there is no interruption to services but we anticipate a spell of isolation once works have commenced to repair the fault.