After electrical checks made this morning, we have now been given the all clear to reopen all spaces affected by last weeks clean water leak int he Harry Fairhurst.
The Student kitchen, LFA 1st floor is now open - hot and cold filter water is available.
The keyboards in the Music Room are now back in use.
The staff space, LFA/128 has now been reopened.